Polar Industries Ltd.
  • Home
  • About
  • Services
  • Process
  • Projects
  • FAQ
  • Contact Us

Project Details

6000 SF Freezer Build - Mississauga, Ontario

Construction sequence for a 6000 SF freezer build in Mississauga, including floor preparation, underfloor heating, and final slab finishing.

Back to All Projects
Removal of existing warehouse concrete floor slab.
Installation of underfloor heated glycol tubing.
Completed underfloor heated glycol tubing layout.
Placement of new 6-inch steel fiber reinforced seamless concrete floor slab.
Installation of 10 mil polyethylene vapor barrier below floor insulation.
Finishing of new concrete freezer floor.
Heat tracing of interior freezer columns.
Final trowel finishing of the freezer floor.
Polar Industries Ltd.

Polar Industries Ltd. | Environmentally Controlled Solutions

PLAN. DESIGN. BUILD. COOL.

Office Location

5063 N Service Rd, Suite 200
Burlington, ON L7L 5H6

437-523-6725 info@polarindustries.org

Get Directions

Business Hours

Monday to Friday: 9am to 5pm

Saturday & Sunday: Closed

Privacy

© 2026 Polar Industries Ltd.